{"id":46712,"date":"2025-06-17T11:58:42","date_gmt":"2025-06-17T14:58:42","guid":{"rendered":"https:\/\/www.copel.com\/site\/?p=46712"},"modified":"2025-09-01T15:15:02","modified_gmt":"2025-09-01T18:15:02","slug":"copel-reforca-qualidade-de-energia-no-centro-sul-com-quatro-novas-subestacoes-e-maior-extensao-da-rede-trifasica-instalada","status":"publish","type":"post","link":"https:\/\/www.copel.com\/site\/noticias\/copel-reforca-qualidade-de-energia-no-centro-sul-com-quatro-novas-subestacoes-e-maior-extensao-da-rede-trifasica-instalada\/","title":{"rendered":"Copel refor\u00e7a qualidade de energia no Centro-Sul com quatro novas subesta\u00e7\u00f5es e maior extens\u00e3o da rede trif\u00e1sica instalada"},"content":{"rendered":"\n<p>Quatro novas subesta\u00e7\u00f5es de energia, a amplia\u00e7\u00e3o de outras 14 subesta\u00e7\u00f5es e a maior extens\u00e3o da rede trif\u00e1sica instalada no Estado fazem parte da infraestrutura de refor\u00e7o do sistema el\u00e9trico que a Copel est\u00e1 implantando neste ano no Centro-Sul paranaense. S\u00e3o cerca de R$ 527,7 milh\u00f5es em recursos aplicados em obras para a qualidade e estabilidade da rede el\u00e9trica de 50 munic\u00edpios, ampliando a seguran\u00e7a energ\u00e9tica para os clientes da regi\u00e3o.&nbsp;<\/p>\n\n\n\n<p><strong>Novas subesta\u00e7\u00f5es<\/strong><\/p>\n\n\n\n<p>Subesta\u00e7\u00f5es de distribui\u00e7\u00e3o s\u00e3o estruturas fundamentais para garantir o fornecimento de energia el\u00e9trica de forma est\u00e1vel, segura e eficiente. Elas s\u00e3o projetadas de acordo com as necessidades espec\u00edficas de cada regi\u00e3o, considerando vari\u00e1veis como crescimento populacional, desenvolvimento econ\u00f4mico, caracter\u00edsticas clim\u00e1ticas e demandas locais de consumo.<\/p>\n\n\n\n<p>As novas subesta\u00e7\u00f5es na regi\u00e3o refor\u00e7am a distribui\u00e7\u00e3o est\u00e1vel de energia para o atendimento a ind\u00fastrias, com\u00e9rcio, resid\u00eancias e propriedades rurais.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-1024x576.jpg\" alt=\"\" class=\"wp-image-46714\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-1024x576.jpg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-300x169.jpg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-768x432.jpg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-1536x864.jpg 1536w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Pirai-do-Sul-2048x1152.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">A nova subesta\u00e7\u00e3o de Pira\u00ed do Sul.<\/figcaption><\/figure>\n\n\n\n<p>A unidade de Pira\u00ed do Sul ter\u00e1 a energiza\u00e7\u00e3o completa em setembro e a de Paula Freitas, est\u00e1 em fase final de obras. E seguem a constru\u00e7\u00e3o das novas estruturas em Mallet e Ponta Grossa.<\/p>\n\n\n\n<p>\u201cAs subesta\u00e7\u00f5es reduzem interrup\u00e7\u00f5es no fornecimento de energia e facilitam o remanejamento da energia, o que permite manter o maior n\u00famero poss\u00edvel de clientes com o servi\u00e7o ativo em caso de desligamentos acidentais\u201d, explica a gerente do departamento de Ativos da Copel, Graziella Gon\u00e7alves.<\/p>\n\n\n\n<p>As subesta\u00e7\u00f5es recebem energia em alta tens\u00e3o e atuam como pontos estrat\u00e9gicos de transforma\u00e7\u00e3o e distribui\u00e7\u00e3o, convertendo a energia para n\u00edveis adequados ao consumo e garantindo seu fornecimento \u00e0s redes urbanas e rurais. A amplia\u00e7\u00e3o do n\u00famero de subesta\u00e7\u00f5es contribui diretamente para o aumento da confiabilidade e da seguran\u00e7a do sistema el\u00e9trico.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"888\" height=\"458\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Subestacao-Paula-Freitas.jpg\" alt=\"\" class=\"wp-image-46715\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Subestacao-Paula-Freitas.jpg 888w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Subestacao-Paula-Freitas-300x155.jpg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Subestacao-Paula-Freitas-768x396.jpg 768w\" sizes=\"(max-width: 888px) 100vw, 888px\" \/><figcaption class=\"wp-element-caption\">Em constru\u00e7\u00e3o, a subesta\u00e7\u00e3o de Paula Freitas est\u00e1 na reta final de obras.<\/figcaption><\/figure>\n\n\n\n<p><strong>Amplia\u00e7\u00f5es<\/strong><\/p>\n\n\n\n<p>Ainda como parte dos investimentos da Copel no Centro-Sul, est\u00e3o sendo aplicados&nbsp; R$ 107,3 milh\u00f5es na amplia\u00e7\u00e3o de 14 subesta\u00e7\u00f5es de distribui\u00e7\u00e3o de energia, entre as quais duas em Ponta Grossa, duas em Palmeira e outras nas cidades de Imbituva, Guarapuava, S\u00e3o Mateus do Sul, Pitanga, Arapoti, Mallet, Irati, Ortigueira, Porto Amazonas e Cruz Machado.&nbsp;<\/p>\n\n\n\n<p>Tamb\u00e9m est\u00e3o em andamento, pela companhia, obras de melhoria em subesta\u00e7\u00f5es de grande porte na regi\u00e3o, que integram a rede de transmiss\u00e3o de energia, localizadas nos munic\u00edpios de S\u00e3o Mateus do Sul, Pinh\u00e3o, Foz do Jord\u00e3o, Ibaiti, Jaguaria\u00edva, Ortigueira, Tel\u00eamaco Borba e Ponta Grossa.<\/p>\n\n\n\n<p><strong>Paran\u00e1 Trif\u00e1sico<\/strong><\/p>\n\n\n\n<p>A regi\u00e3o Centro-Sul \u00e9 a que tem a maior extens\u00e3o de rede trif\u00e1sica j\u00e1 implantada pela Copel no Estado, com 5.218 quil\u00f4metros de novas redes trif\u00e1sicas at\u00e9 junho.<\/p>\n\n\n\n<p>A troca das redes monof\u00e1sicas por trif\u00e1sicas \u00e9 porta de entrada \u00e0s novas tecnologias e a garantia de uma rede el\u00e9trica mais potente e est\u00e1vel aos produtores rurais paranaenses. J\u00e1 s\u00e3o mais de 22 mil quil\u00f4metros de novas redes trif\u00e1sicas implantadas em todo o Paran\u00e1.<br><br>Os cinco munic\u00edpios da regi\u00e3o com maior quilometragem de novas redes j\u00e1 instaladas s\u00e3o Prudent\u00f3polis, com 283 Km; Reserva, 278 km; Castro, 251 Km; Ortigueira, 239 Km e Ponta Grossa, 224 km.&nbsp; &nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1-1024x575.jpg\" alt=\"\" class=\"wp-image-46716\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1-1024x575.jpg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1-300x169.jpg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1-768x432.jpg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1-1536x863.jpg 1536w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2025\/06\/Rede-Parana-Trifasico-Rural-1.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">O Centro-Sul tem a maior extens\u00e3o de rede trif\u00e1sica j\u00e1 implantada pela Copel no Estado, com 5.218 Km.<\/figcaption><\/figure>\n\n\n\n<p>Ao longo de cinco anos, o Paran\u00e1 Trif\u00e1sico, maior programa de moderniza\u00e7\u00e3o da rede el\u00e9trica rural do Brasil, soma investimentos que somam R$ 3 bilh\u00f5es.<\/p>\n\n\n\n<p>O sistema trif\u00e1sico tem in\u00fameras vantagens se comparado \u00e0 rede monof\u00e1sica. Por ser mais robusto, previne quedas de energia tempor\u00e1rias, o que evita preju\u00edzos \u00e0 produ\u00e7\u00e3o; possibilita a distribui\u00e7\u00e3o de energia el\u00e9trica eficiente para longas dist\u00e2ncias; a pot\u00eancia total nas tr\u00eas fases nunca \u00e9 nula e permite a utiliza\u00e7\u00e3o de geradores e motores menores e mais leves, dispensando a utiliza\u00e7\u00e3o de dispositivos especiais.&nbsp;<\/p>\n\n\n\n<p><strong>Conex\u00e3o \u00e0 rede trif\u00e1sica<\/strong><\/p>\n\n\n\n<p>Uma vez instalada a rede trif\u00e1sica na regi\u00e3o, o cliente que deseja se conectar \u00e0 nova rede deve padronizar a entrada de servi\u00e7o de energia da sua propriedade \u00e0 nova carga e ajustar as instala\u00e7\u00f5es. S\u00e3o servi\u00e7os que devem ser feitos por um t\u00e9cnico habilitado, conforme as normas t\u00e9cnicas e o projeto el\u00e9trico.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Com o padr\u00e3o pronto, basta solicitar a altera\u00e7\u00e3o de carga pelos canais de atendimento da Copel no site <a href=\"https:\/\/www.copel.com\/\">www.copel.com<\/a>, via 0800 51 00116 ou presencialmente em um dos postos de atendimento da companhia. Caso o padr\u00e3o instalado na propriedade j\u00e1 esteja adequado \u00e0 rede trif\u00e1sica o cliente pode agendar o desligamento da rede monof\u00e1sica e a reativa\u00e7\u00e3o da liga\u00e7\u00e3o, como trif\u00e1sica, tamb\u00e9m pelos canais de atendimento da Copel.&nbsp; Em m\u00e9dia, o prazo para a ativa\u00e7\u00e3o da nova rede \u00e9 de 20 dias \u00fateis.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Rede El\u00e9trica Inteligente<\/strong><\/p>\n\n\n\n<p>A implanta\u00e7\u00e3o dos medidores inteligentes de energia tamb\u00e9m est\u00e1 em franca expans\u00e3o nos munic\u00edpios da regi\u00e3o. \u00c9 a tecnologia aplicada para a estabilidade na distribui\u00e7\u00e3o de energia, com monitoramento permanente da rede e menor tempo de desligamento provocado por intemp\u00e9ries e outros fatores externos ao sistema.<br><br>S\u00e3o R$ 19,3 milh\u00f5es de investimentos nos novos equipamentos de rede e medidores que est\u00e3o sendo instalados em unidades consumidoras de 33 cidades da regi\u00e3o: Antonio Olinto; Bituruna; Boa Ventura de S\u00e3o Roque; Campina do Sim\u00e3o; Carambe\u00ed; Cruz Machado; Fernandes Pinheiro; General Carneiro; Guamiranga; Guarapuava; Imbituva; In\u00e1cio Martins; Irati; Iva\u00ed; Laranjal; Mallet; Palmital; Palmeira; Paula Freitas; Paulo Frontin; Pinh\u00e3o; Ponta Grossa; Porto Amazonas; Porto Vit\u00f3ria; Prudent\u00f3polis; Rebou\u00e7as; Rio Azul; Santa Maria do Oeste; S\u00e3o Jo\u00e3o do Triunfo; S\u00e3o Mateus do Sul; Teixeira Soares; Turvo e Uni\u00e3o da Vit\u00f3ria.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quatro novas subesta\u00e7\u00f5es de energia, a amplia\u00e7\u00e3o de outras 14 subesta\u00e7\u00f5es e a maior extens\u00e3o da rede trif\u00e1sica instalada no Estado fazem parte da infraestrutura de refor\u00e7o do sistema el\u00e9trico que a Copel est\u00e1 implantando neste ano no Centro-Sul paranaense. S\u00e3o cerca de R$ 527,7 milh\u00f5es em recursos aplicados em obras para a qualidade e [&hellip;]<\/p>\n","protected":false},"author":45,"featured_media":46713,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[142],"tags":[25,43,941,141,9],"class_list":["post-46712","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-copel","tag-distribuicao","tag-forcadacopel","tag-investimentos","tag-sustentabilidade"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/46712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/comments?post=46712"}],"version-history":[{"count":2,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/46712\/revisions"}],"predecessor-version":[{"id":48254,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/46712\/revisions\/48254"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media\/46713"}],"wp:attachment":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media?parent=46712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/categories?post=46712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/tags?post=46712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}