{"id":2739,"date":"2020-02-21T16:46:00","date_gmt":"2020-02-21T19:46:00","guid":{"rendered":"http:\/\/webhpcprd\/hpcweb\/?p=2739"},"modified":"2022-10-03T11:22:53","modified_gmt":"2022-10-03T14:22:53","slug":"copel-transmissao-vai-aumentar-a-capacidade-de-linhas-de-transmissao-na-rmc","status":"publish","type":"post","link":"https:\/\/www.copel.com\/site\/noticias\/copel-transmissao-vai-aumentar-a-capacidade-de-linhas-de-transmissao-na-rmc\/","title":{"rendered":"Copel Transmiss\u00e3o vai aumentar a capacidade de linhas de transmiss\u00e3o na RMC"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"398\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2020\/02\/linha-de-transmissao.jpg\" alt=\"Linha de transmiss\u00e3o\" class=\"wp-image-2743\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2020\/02\/linha-de-transmissao.jpg 600w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2020\/02\/linha-de-transmissao-300x199.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p>A Copel&nbsp;GeT&nbsp;vai refor\u00e7ar o sistema de transmiss\u00e3o na regi\u00e3o metropolitana de Curitiba com a recapacita\u00e7\u00e3o&nbsp;de duas&nbsp;importantes&nbsp;linhas que operam em 230 mil volts (kV)&nbsp;e conectam a subesta\u00e7\u00e3o Pilarzinho&nbsp;\u00e0s subesta\u00e7\u00f5es&nbsp;Santa M\u00f4nica e Bateias.&nbsp;&nbsp;O investimento previsto \u00e9 de R$ 32 milh\u00f5es.&nbsp;<\/p>\n\n\n\n<p>No total,&nbsp;63 km de linhas devem passar por&nbsp;uma&nbsp;reforma geral, incluindo a&nbsp;troca de&nbsp;cabos condutores antigos por novos que tenham maior capacidade de conduzir corrente el\u00e9trica&nbsp;e, tamb\u00e9m, substitui\u00e7\u00e3o de&nbsp;torres (por conta dos novos esfor\u00e7os e tra\u00e7\u00f5es), cadeias de isoladores, cabos para-raios, aterramentos&nbsp;e outros.&nbsp;&nbsp;<\/p>\n\n\n\n<p>A \u00e1rea de Engenharia de Obras&nbsp;da&nbsp;GeT&nbsp;vai&nbsp;lan\u00e7ar nos pr\u00f3ximos dias&nbsp;a licita\u00e7\u00e3o para contrata\u00e7\u00e3o do projeto. As obras&nbsp;devem&nbsp;ter in\u00edcio no&nbsp;segundo semestre de 2021&nbsp;e&nbsp;ser conclu\u00eddas&nbsp;at\u00e9 janeiro de 2023, prazo estabelecido na Resolu\u00e7\u00e3o Autorizativa da Ag\u00eancia Nacional de Energia El\u00e9trica n\u00ba 8543, de 21 de janeiro de 2020.&nbsp;Quando&nbsp;a reforma estiver conclu\u00edda, haver\u00e1 um incremento de R$ 4,2 milh\u00f5es ao ano na receita da Transmiss\u00e3o.&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>\u201cA&nbsp;recapacita\u00e7\u00e3o tem como objetivo&nbsp;melhorar o atendimento \u00e0 demanda por energia na RMC&nbsp;e&nbsp;tornar&nbsp;a rede de transmiss\u00e3o mais confi\u00e1vel, reduzindo o risco de desligamentos&nbsp;causados por falha em equipamentos&nbsp;obsoletos\u201d, explica o diretor presidente da Copel Gera\u00e7\u00e3o e Transmiss\u00e3o, Moacir Carlos&nbsp;Bertol.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-1 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/webhpcprd\/site\/wp-content\/uploads\/2020\/02\/torre.jpg\"><img decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/webhpcprd\/site\/wp-content\/uploads\/2020\/02\/torre.jpg\" alt=\"\" data-id=\"2741\" data-full-url=\"https:\/\/webhpcprd\/site\/wp-content\/uploads\/2020\/02\/torre.jpg\" data-link=\"https:\/\/webhpcprd\/site\/?attachment_id=2741\" class=\"wp-image-2741\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2020\/02\/torre.jpg 640w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2020\/02\/torre-300x225.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A Copel&nbsp;GeT&nbsp;vai refor\u00e7ar o sistema de transmiss\u00e3o na regi\u00e3o metropolitana de Curitiba com a recapacita\u00e7\u00e3o&nbsp;de duas&nbsp;importantes&nbsp;linhas que operam em 230 mil volts (kV)&nbsp;e conectam a subesta\u00e7\u00e3o Pilarzinho&nbsp;\u00e0s subesta\u00e7\u00f5es&nbsp;Santa M\u00f4nica e Bateias.&nbsp;&nbsp;O investimento previsto \u00e9 de R$ 32 milh\u00f5es.&nbsp; No total,&nbsp;63 km de linhas devem passar por&nbsp;uma&nbsp;reforma geral, incluindo a&nbsp;troca de&nbsp;cabos condutores antigos por novos que [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":2742,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[22],"tags":[21],"class_list":["post-2739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-transmissao","tag-linhas-de-transmissao"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/2739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/comments?post=2739"}],"version-history":[{"count":0,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/2739\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media\/2742"}],"wp:attachment":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media?parent=2739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/categories?post=2739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/tags?post=2739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}