{"id":17122,"date":"2021-10-16T13:02:23","date_gmt":"2021-10-16T16:02:23","guid":{"rendered":"https:\/\/www.copel.com\/hpcweb\/?p=17122"},"modified":"2022-10-03T11:27:15","modified_gmt":"2022-10-03T14:27:15","slug":"temporal-quebrou-mais-de-500-postes-no-oeste-e-noroeste","status":"publish","type":"post","link":"https:\/\/www.copel.com\/site\/noticias\/temporal-quebrou-mais-de-500-postes-no-oeste-e-noroeste\/","title":{"rendered":"Temporal quebrou mais de 500 postes no Oeste e Noroeste"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Sao-Joao-do-Caiua-1024x768.jpeg\" alt=\"\" class=\"wp-image-17123\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Sao-Joao-do-Caiua-1024x768.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Sao-Joao-do-Caiua-300x225.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Sao-Joao-do-Caiua-768x576.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Sao-Joao-do-Caiua.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Trabalho de recomposi\u00e7\u00e3o da rede el\u00e9trica em S\u00e3o Jo\u00e3o do Caiu\u00e1<\/figcaption><\/figure>\n\n\n\n<p>Equipes de emerg\u00eancia, manuten\u00e7\u00e3o e obras da Copel seguem em campo neste s\u00e1bado, dando continuidade aos trabalhos de recupera\u00e7\u00e3o das redes el\u00e9tricas danificadas pelo segundo pior temporal j\u00e1 enfrentado na hist\u00f3ria da empresa. As chuvas de ontem dificultaram a execu\u00e7\u00e3o dos trabalhos e provocaram novos estragos. J\u00e1 foram contabilizados 508 postes quebrados, nas duas regi\u00f5es.<\/p>\n\n\n\n<p>Na regi\u00e3o Oeste, at\u00e9 o momento foram encontrados 270 postes quebrados. A situa\u00e7\u00e3o mais grave se encontra em Jesu\u00edtas, pr\u00f3ximo a Assis Chateaubriand, onde cerca de 40 estruturas est\u00e3o sendo substitu\u00eddas em uma for\u00e7a-tarefa que conta com dezenas de trabalhadores. Duas carretas fazem o transporte dos postes para reposi\u00e7\u00e3o em campo. Em toda a regi\u00e3o, h\u00e1 1.900 ocorr\u00eancias para atendimento a 17 mil unidades consumidoras sem luz.<\/p>\n\n\n\n<p>Na regi\u00e3o Noroeste, 22 mil domic\u00edlios encontram-se desligados, boa parte deles em decorr\u00eancia de um segundo temporal que atingiu a regi\u00e3o no final da tarde desta sexta, dia 15. O munic\u00edpio de Terra Rica teve as duas fontes de alimenta\u00e7\u00e3o danificadas pela queda de \u00e1rvores sobre as redes el\u00e9tricas. Ao todo, s\u00e3o 12 postes quebrados nas redes que chegam at\u00e9 a cidade, al\u00e9m de cabos rompidos nas redes urbanas e rurais dentro do munic\u00edpio. O t\u00e9cnico local, Joede Correia de Ara\u00fajo, relata que as equipes trabalharam durante toda a madrugada e que o fornecimento acaba de ser parcialmente restabelecido na cidade.<\/p>\n\n\n\n<p>O munic\u00edpio de Inaj\u00e1 tamb\u00e9m chegou a sofrer desligamento por conta das chuvas de ontem, devido a \u00e1rvores sobre a rede, postes quebrados e cabos rompidos, mas j\u00e1 teve o fornecimento remanejado. Ainda na regi\u00e3o, o munic\u00edpio de Quer\u00eancia do Norte teve 54 postes quebrados \u00e9 um dos que mais concentra servi\u00e7os, nas \u00e1reas urbana e rural, inclusive em alguns locais em que o acesso ainda est\u00e1 dificultado.<\/p>\n\n\n\n<p>A Copel lembra que, em dias de tempestades, deve-se manter dist\u00e2ncia de situa\u00e7\u00f5es que possam oferecer riscos, como postes quebrados e fios rompidos. A falta de luz pode ser comunicada pelo site e aplicativo, pelo telefone 0800 51 00 116 e pelo WhatsApp 41 3013-8973. H\u00e1 ainda a op\u00e7\u00e3o de enviar uma mensagem de texto (SMS) para o n\u00famero 28593, com as letras \u201cSL\u201d e o n\u00famero da unidade consumidora.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Jesuitas-1024x577.jpeg\" alt=\"\" class=\"wp-image-17124\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Jesuitas-1024x577.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Jesuitas-300x169.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Jesuitas-768x432.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Jesuitas.jpeg 1156w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Situa\u00e7\u00e3o da rede el\u00e9trica em Jesu\u00edtas<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"765\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Terra-Rica-1024x765.jpeg\" alt=\"\" class=\"wp-image-17125\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Terra-Rica-1024x765.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Terra-Rica-300x224.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Terra-Rica-768x574.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/10\/Terra-Rica.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Rede el\u00e9trica tombada pelo vento em Terra Rica<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Equipes de emerg\u00eancia, manuten\u00e7\u00e3o e obras da Copel seguem em campo neste s\u00e1bado, dando continuidade aos trabalhos de recupera\u00e7\u00e3o das redes el\u00e9tricas danificadas pelo segundo pior temporal j\u00e1 enfrentado na hist\u00f3ria da empresa. As chuvas de ontem dificultaram a execu\u00e7\u00e3o dos trabalhos e provocaram novos estragos. J\u00e1 foram contabilizados 508 postes quebrados, nas duas regi\u00f5es. [&hellip;]<\/p>\n","protected":false},"author":37,"featured_media":17123,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[268],"class_list":["post-17122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-distribuicao","tag-temporal"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/17122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/comments?post=17122"}],"version-history":[{"count":0,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/17122\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media\/17123"}],"wp:attachment":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media?parent=17122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/categories?post=17122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/tags?post=17122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}