{"id":11707,"date":"2021-04-16T17:28:05","date_gmt":"2021-04-16T20:28:05","guid":{"rendered":"https:\/\/www.copel.com\/hpcweb\/?p=11707"},"modified":"2022-10-03T11:24:19","modified_gmt":"2022-10-03T14:24:19","slug":"reservatorio-da-pch-bela-vista-ja-esta-formado","status":"publish","type":"post","link":"https:\/\/www.copel.com\/site\/noticias\/reservatorio-da-pch-bela-vista-ja-esta-formado\/","title":{"rendered":"Reservat\u00f3rio da PCH Bela Vista j\u00e1 est\u00e1 formado"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"804\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/PCH-BLV_reservatorio-cheio-1024x804.jpeg\" alt=\"PCH Bela Vista reservat\u00f3rio cheio\" class=\"wp-image-11702\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/PCH-BLV_reservatorio-cheio-1024x804.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/PCH-BLV_reservatorio-cheio-300x236.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/PCH-BLV_reservatorio-cheio-768x603.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/PCH-BLV_reservatorio-cheio.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Foi conclu\u00eddo o processo de enchimento do reservat\u00f3rio da Pequena Central Hidrel\u00e9trica Bela Vista, instalada pela Copel no rio Chopim, entre os munic\u00edpios de Ver\u00ea e S\u00e3o Jo\u00e3o, no sudoeste do Paran\u00e1. Est\u00e3o sendo investidos R$ 224 milh\u00f5es no empreendimento, que ter\u00e1 29,8 MW de capacidade instalada e vai produzir energia el\u00e9trica para 100 mil pessoas.<\/p>\n\n\n\n<p>O reservat\u00f3rio ocupa uma \u00e1rea de 266 hectares. Deste total, 177 hectares j\u00e1 eram calha do rio e 89 hectares correspondem \u00e0 \u00e1rea alagada. Ao redor de toda a represa, ser\u00e1 mantida uma faixa de 100 metros de vegeta\u00e7\u00e3o compondo a \u00e1rea de preserva\u00e7\u00e3o permanente.<\/p>\n\n\n\n<p>Parte da \u00e1gua do reservat\u00f3rio j\u00e1 est\u00e1 vertendo por cima da barragem, conforme previsto em projeto. Agora, os trabalhos concentram-se na conclus\u00e3o da montagem dos equipamentos na casa de for\u00e7a da PCH, que abriga os conjuntos de turbinas e geradores. Nas pr\u00f3ximas semanas, ser\u00e3o realizados os testes pr\u00e9-operacionais das unidades geradoras de energia. &nbsp;<\/p>\n\n\n\n<p>Tamb\u00e9m est\u00e3o em andamento as obras de instala\u00e7\u00e3o da linha de distribui\u00e7\u00e3o em alta tens\u00e3o (138 mil volts), com 18 km de extens\u00e3o, que vai levar a energia a ser gerada na PCH at\u00e9 a subesta\u00e7\u00e3o Dois Vizinhos.<\/p>\n\n\n\n<p><strong>Nova ponte<\/strong><\/p>\n\n\n\n<p>Com a forma\u00e7\u00e3o da represa, a travessia sobre o rio Chopim na \u00e1rea do reservat\u00f3rio deixou de ser feita por balsa e, agora, acontece pela nova ponte, constru\u00edda tamb\u00e9m pela Copel, e que faz a integra\u00e7\u00e3o entre os munic\u00edpios de&nbsp;Ver\u00ea&nbsp;e S\u00e3o Jo\u00e3o. O tr\u00e1fego est\u00e1 liberado inicialmente para ve\u00edculos leves, das 7h30 \u00e0s 18h&nbsp;&#8211; per\u00edodo em que funcionava a balsa.&nbsp;Quando a usina iniciar a opera\u00e7\u00e3o, a passagem na ponte ser\u00e1 liberada para todos os ve\u00edculos e sem restri\u00e7\u00e3o de hor\u00e1rio.&nbsp;&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Nova-Ponte-de-Integracao-entre-Vere-e-Sao-Joao-1024x576.jpeg\" alt=\"Nova Ponte de Integra\u00e7\u00e3o entre Ver\u00ea e S\u00e3o Jo\u00e3o\" class=\"wp-image-11703\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Nova-Ponte-de-Integracao-entre-Vere-e-Sao-Joao-1024x576.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Nova-Ponte-de-Integracao-entre-Vere-e-Sao-Joao-300x169.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Nova-Ponte-de-Integracao-entre-Vere-e-Sao-Joao-768x432.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Nova-Ponte-de-Integracao-entre-Vere-e-Sao-Joao.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Nova Ponte de Integra\u00e7\u00e3o entre Ver\u00ea e S\u00e3o Jo\u00e3o<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Com-o-reservatorio-cheio-as-aguas-no-Rio-Chopim-vertem-sobre-a-barragem-da-PCH-1024x576.jpeg\" alt=\"Com o reservat\u00f3rio cheio, as \u00e1guas no Rio Chopim vertem sobre a barragem da PCH\" class=\"wp-image-11704\" srcset=\"https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Com-o-reservatorio-cheio-as-aguas-no-Rio-Chopim-vertem-sobre-a-barragem-da-PCH-1024x576.jpeg 1024w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Com-o-reservatorio-cheio-as-aguas-no-Rio-Chopim-vertem-sobre-a-barragem-da-PCH-300x169.jpeg 300w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Com-o-reservatorio-cheio-as-aguas-no-Rio-Chopim-vertem-sobre-a-barragem-da-PCH-768x432.jpeg 768w, https:\/\/www.copel.com\/site\/wp-content\/uploads\/2021\/04\/Com-o-reservatorio-cheio-as-aguas-no-Rio-Chopim-vertem-sobre-a-barragem-da-PCH.jpeg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Com o reservat\u00f3rio cheio, as \u00e1guas no Rio Chopim vertem sobre a barragem da PCH<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Foi conclu\u00eddo o processo de enchimento do reservat\u00f3rio da Pequena Central Hidrel\u00e9trica Bela Vista, instalada pela Copel no rio Chopim, entre os munic\u00edpios de Ver\u00ea e S\u00e3o Jo\u00e3o, no sudoeste do Paran\u00e1. Est\u00e3o sendo investidos R$ 224 milh\u00f5es no empreendimento, que ter\u00e1 29,8 MW de capacidade instalada e vai produzir energia el\u00e9trica para 100 mil [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":11702,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6,142],"tags":[122,77,334,79],"class_list":["post-11707","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geracao","category-noticias","tag-pch","tag-pch-bela-vista","tag-reservatorio","tag-rio-chopim"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/11707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/comments?post=11707"}],"version-history":[{"count":0,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/posts\/11707\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media\/11702"}],"wp:attachment":[{"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/media?parent=11707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/categories?post=11707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.copel.com\/site\/wp-json\/wp\/v2\/tags?post=11707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}