The following table features capacity and productivity figures from Copel’s power plants, from January to December of 2016:
Power Plants | Installed Capacity (MW) | Assured Power (Average MW) | Generation (GWh) | Concession Expires |
Hydroelectric Power Plants | 4,463.9 | 1,943.4 | 25,785.1 | |
HPP Gov. Bento Munhoz da Rocha Netto (Foz do Areia) | 1,676.0 | 576.0 | 7,860.0 | 09.17.2023 |
HPP Gov. Ney Aminthas de Barros Braga (Segredo) | 1,260.0 | 603.0 | 8,017.3 | 11.15.2029 |
HPP Gov. José Richa (Salto Caxias) | 1,240.0 | 605.0 | 8,017.5 | 05.04.2030 |
HPP Mauá (1) | 185.2 | 100.8 | 1,391.9 | 07.02.2042 |
HPP Guaricana | 36.0 | 16.1 | 156.8 | 08.16.2026 |
SHP Cavernoso II (2) | 19.0 | 10.6 | 54.7 | 02.27.2046 |
HPP Chaminé | 18.0 | 11.6 | 132.9 | 08.16.2026 |
HPP Apucaraninha | 10.0 | 6.7 | 35.7 | 10.12.2025 |
HPP Derivação do Rio Jordão | 6.5 | 5.9 | 49.0 | 11.15.2029 |
HPP Marumbi | 4.8 | 2.4 | 21.1 | (3) |
HPP São Jorge | 2.3 | 1.5 | 16.3 | 12.03.2024 |
HPP Chopim I | 2.0 | 1.5 | 13.6 | (4) |
HPP Cavernoso | 1.3 | 1.0 | 5.1 | 01.07.2031 |
SHP Melissa | 1.0 | 0.6 | 5.9 | (4) |
SHP Salto do Vau | 0.9 | 0.6 | 6.3 | (4) |
SHP Pitangui | 0.9 | 0.1 | 1.0 | (4) |
Thermal Power Plant | 20.0 | 10.3 | 61.5 | |
TTP Figueira | 20.0 | 10.3 | 61.5 | 03.26.2019 |
Wind Energy Plants | 2.5 | 0.5 | 3.4 | |
UEE Eólica de Palmas (5) | 2.5 | 0.5 | 3.4 | 09.28.2029 |
TOTAL | 4,486.4 | 1,954.2 | 25,850.0 | |
(1) Refered to COPEL's participation (51% of power plant capacity of 363 MW). (2) Plant resumes commercial operation in June 2016. (3) Submitted to ANEEL for ratification. (4) Power plants with no concession agreement, only required to be registered at ANEEL. (5) Average wind plant generation. |