The following table features capacity and productivity figures from Copel’s power plants, from January to December of 2016:

Power Plants
Installed
Capacity (MW)
Assured Power
(Average MW)
Generation
(GWh)
Concession Expires
Hydroelectric Power Plants
4,463.9
1,943.4
25,785.1
HPP Gov. Bento Munhoz da Rocha Netto (Foz do Areia)
1,676.0
576.0
7,860.0
09.17.2023
HPP Gov. Ney Aminthas de Barros Braga (Segredo)
1,260.0
603.0
8,017.3
11.15.2029
HPP Gov. José Richa (Salto Caxias)
1,240.0
605.0
8,017.5
05.04.2030
HPP Mauá (1)
185.2
100.8
1,391.9
07.02.2042
HPP Guaricana
36.0
16.1
156.8
08.16.2026
SHP Cavernoso II (2)
19.0
10.6
54.7
02.27.2046
HPP Chaminé
18.0
11.6
132.9
08.16.2026
HPP Apucaraninha
10.0
6.7
35.7
10.12.2025
HPP Derivação do Rio Jordão
6.5
5.9
49.0
11.15.2029
HPP Marumbi
4.8
2.4
21.1
(3)
HPP São Jorge
2.3
1.5
16.3
12.03.2024
HPP Chopim I
2.0
1.5
13.6
(4)
HPP Cavernoso
1.3
1.0
5.1
01.07.2031
SHP Melissa
1.0
0.6
5.9
(4)
SHP Salto do Vau
0.9
0.6
6.3
(4)
SHP Pitangui
0.9
0.1
1.0
(4)
Thermal Power Plant
20.0
10.3
61.5
TTP Figueira
20.0
10.3
61.5
03.26.2019
Wind Energy Plants
2.5
0.5
3.4
UEE Eólica de Palmas (5)
2.5
0.5
3.4
09.28.2029
TOTAL
4,486.4
1,954.2
25,850.0
(1) Refered to COPEL's participation (51% of power plant capacity of 363 MW). (2) Plant resumes commercial operation in June 2016.

(3) Submitted to ANEEL for ratification.

(4) Power plants with no concession agreement, only required to be registered at ANEEL.

(5) Average wind plant generation.



Last update 04.07.17